Investor: Becamex IDC Corp.
Total investment: 683 billion VND
Total length: 62 km (bordering Ho Chi Minh City, through the main industrial parks of Binh Duong province, bordering Binh Phuoc province)
Has been put into operation since 2000.
Technical standards
Upgrade traffic toll system:
To meet the customers’ convenient transportation needs and help manage the toll collection system more effectively, Becamex IDC Corp has installed a new automatic and semi-automatic fee management software and hardware system for both toll stations on Binh Duong Boulevard (8 lanes/station).
Other information:
The project has been equitized and operated as a joint-stock company since April, 2007.
Chartered Capital: 337 billion VND – Becamex accounts for 75% of the chartered capital.
Future Development:
Becamex Corporation has set up a project to renovate and expand National Highway 13 (from Vinh Binh bridge to Le Hong Phong intersection) in the form of a BOT and has submitted it to the Department of Planning and Investment for evaluation, with some main contents: right – sided route expansion (in the direct of Ho Chi Minh City to Binh Duong)with 2 more lanes, investment in sidewalks and greenery, and construction of a new synchronous drainage system from Ø800-Ø1500.
The route starts from the My Phuoc Industrial and Urban area and passes through large ...